Getting Started
Please find the installation document for the GL502 Asset Tracker.
Fri, Nov 26, 2021 at 5:05 AM
To power on the device, use a magnet to approach the magnetic reed switch. The reed switch detects the presence of magnetic fields and defaults to an open p...
Thu, Mar 14, 2024 at 1:04 AM
The GL502 asset tracker can be installed using any of the 2 methods: Option 1 - Drill the asset and attach the asset tracker to the asset with the help of...
Fri, Nov 26, 2021 at 5:10 AM